Building a house in Panipat? What to buy at each of the 6 stages

Image
Building a house in Panipat, Sonipat or Karnal? The costliest plumbing mistakes are not about price. They are about timing . A pipe that goes under the slab, or into a wall before plaster, stays there for the life of the house. Here is what to decide at each of the six stages of a build, and why. 1. Foundation: before the slab is cast Drainage goes in first. Once the slab is cast, the pipe under it cannot be changed without breaking the floor. Drainage pipe: choose a leak-proof, low-noise system such as Huliot Ultra Silent or HT Pro. Silent pipe matters most where bathrooms sit above bedrooms. Surface drainage: plan channels and gullies for the driveway, porch and terrace now (for example MEA channels and yard gullies). 2. Concealed pipes: before plaster Water supply pipes, manifolds and the concealed bodies of diverters and mixers are locked into the wall when plaster goes on. Pipes: composite (PE-RT/Al/PE-RT) pipe with brass fittings, or stainless steel press-fit pipe, both handle...